A design-build contractor holds the design, the engineering, the permits and the construction under one contract. That structure matters most on the jobs where a gap between trades costs the owner real money: a retrofit that needs stamped plans, a balcony repair that follows an inspection, an ADU that has to clear plan check. Since 1987, SKS Construction has worked this way, with licensed engineers on staff and a fixed price from day one.
The traditional route runs through separate parties. An architect draws the plans, an engineer stamps them, a general contractor bids them, and the owner coordinates between all three. Each party signs its own agreement and answers only for its own scope.
When the contractor finds that the drawings don't match what's behind the wall, nobody owns the problem. The architect says the field conditions changed. The contractor writes a change order. The owner pays for the gap, and the schedule moves while the three sides work out who is responsible.
A design-build contractor removes that hand-off by working under a single contract. The people who draw the plans are the people who price and build them, so a conflict between the drawing and the building gets resolved inside one company instead of across three invoices.
At SKS, one contract covers design, engineering, permits, construction and city sign-off. The owner has one point of contact, one schedule and one price. Our team includes in-house architects, engineers, licensed contractors and full-time crews, so the work doesn't change hands between companies.
A design-build contractor also sits in a different position on the price. Because the same firm designs and builds the work, estimating starts during design rather than after it. The owner sees what a layout decision costs while the layout can still change, before any bid comes back over budget.
A single contract only helps if the number in it holds. Our bids carry no subject-to-change clauses. The price an owner signs is the price on the job, which is the part of a design-build contractor's offer that owners can check against the document.
Our post on fixed pricing in construction covers how that works in practice and why it is uncommon.
On a split project, the owner becomes the project manager by default. Someone has to carry the architect's questions to the contractor, the contractor's questions to the engineer, and the city's comments to all three. Most owners have a day job, and this coordination arrives in the middle of it.
A design-build contractor takes that work over. Scheduling the engineer, the permit submittal and the crew is part of the contract, and the owner reviews decisions instead of chasing people for them. For a property manager with several buildings, or an HOA president who volunteers their evenings, that difference is the reason to hire one design-build contractor over three separate firms.
It also changes how time works on the job. Design, permitting and construction planning overlap instead of waiting on each other. The crew's input on materials and sequencing reaches the drawings while they are still being drawn, which prevents the redesigns that follow a bid that comes back too high.
The advantage shows up differently on each type of job. A few examples from the work we do in Los Angeles:
Custom homes follow the same pattern. A custom home or major remodel runs best when the architect and the builder have agreed on the budget before the drawings are final.
Permits are where split projects stall. Plans go to LADBS or another city department, a plan checker returns comments, and someone has to decide whether the architect, the engineer or the contractor answers them. With a design-build contractor, that question has one answer.
The same holds at the end of the job. City sign-off is written into our contract, so the owner has nothing left to chase after the crew leaves. Our founder, Sol Shaolian, began his career as a plan checker for the City of Los Angeles, and that background shapes how we prepare submittals so they clear review.
Some owners prefer to hire an architect first and take the finished plans out to bid, and that is a legitimate way to build. It works best on a project where the owner wants to manage the design personally and has the time to run the process. The trade-off is that the owner carries the coordination, and the price is not firm until the bids come in.
Owners who want a fixed number early and a single firm answering for the result tend to hire a design-build contractor. Our clients are mostly property owners with deadlines, budgets and tenants, which is why we built our company around the single contract.
Single-family owners benefit from the clearer budget. Property managers and owners of multifamily buildings benefit from having one firm answer for a compliance deadline. HOA boards get one contract to put in front of the membership and one firm to hold to the schedule.
Owners who need more than one service gain the most from a design-build contractor. A building with a soft-story deficiency, aging balconies and an overloaded electrical panel would normally mean three separate bids and three separate sets of paperwork. Under one contract, the work is sequenced by an engineer who has looked at all of it.
Whoever you hire, ask these before you sign:
The answers from a design-build contractor tell you how much of the coordination work you are buying and how much you are keeping for yourself.
If you own a building or a home in Los Angeles and are weighing separate bids against one contract, we'll walk through your project with you. The consultation is complimentary, and you speak directly with the owners. Call (818) 855-1181 or contact us to start.