fbpx

(818)855-1181

This project consisted of replacing the old existing stucco facade with full height tempered and laminated glass panels supported by hot dipped galvanized structural steel frame. Furthermore the footprint of the building was enlarged to the front property line, and full height second floor windows were installed.

This Project was comprised of construction of several buildings in two parks in the City of Santa Monica, including, concession and restroom facilities as well as storage buildings. The Buildings were comprised of prefabricated Ribbed, curved and skewed Metal Stud-crete panels on concrete foundations.

South Pasadena commercial tenant improvement projects.

From conceptual design, permitting, to final construction; this project consisted of total renovation of five buildings comprising of warehouses and office space as well as underpinning and foundation repair to a footing/wall settlement of fourteen inches due to soil erosion. SKS was able to design, permit and construct all within budget and time.

GET A FREE QUOTE