Most owners ask for a bigger panel before anyone has measured what the building draws. The right electrical service upgrade comes from a load calculation, and the amperage follows from it. A 400A service fits some properties and is wasted on others, and an 800A service is overkill unless the building's demand calls for it.
We have handled service upgrades from 200A to 800A+ with an in-house licensed engineer reviewing each one, and we bid them at a fixed price. This guide covers what each size gets you and how to tell which one your property needs.
Amperage is the ceiling on how much electricity your building can draw at once. Every appliance, light, air conditioner and charger pulls from the same supply. When the combined demand reaches the ceiling, breakers trip, and on an undersized service that happens more often as you add loads.
A larger service doesn't make the building use more power. It gives you room to add loads without another upgrade. It also costs more to install, so you want the size your calculated demand supports, with a sensible margin for what you plan to add.
A 400A electrical service upgrade suits large single-family homes, homes with an ADU, and small multifamily buildings where the demand is real but not heavy. It typically gives you room for central air conditioning, electric cooking and a few EV chargers on one property.
It also covers the usual reasons owners upgrade: a remodel that adds circuits, a battery system, or a permit that stalls because the existing service is too small. Our guide to going solar explains why the panel has to come first when you add solar, and the same logic applies to batteries.
If your demand sits comfortably under the 400A line, spending more on a larger service buys capacity you may never use.
An 800A electrical service upgrade belongs on larger multifamily and mixed-use properties. It carries the combined demand of many units plus common areas, and it leaves room for building-wide EV charging and shared mechanical equipment.
Buildings in this range usually involve more than the main panel. Meter banks, feeders and unit subpanels all have to carry the new capacity, and the utility has to confirm it can supply it. We cover that in our post on mixed meter banks in 8 to 20 unit buildings.

These are starting points. The calculation decides.
Two buildings of the same size can land on different answers. A building with gas appliances and no EV plans draws far less than one that is all-electric with chargers in every parking space.
An electrical service upgrade starts with the numbers. A load calculation adds up the connected loads, applies the demand factors the electrical code allows, and produces the amperage your service has to carry. Our engineer runs it against your existing equipment and your plans, so it covers what you add in the next few years as well as what you run today.
That is also where you find out whether the existing feeders, meters and subpanels can carry the new service. An electrical service upgrade that ignores them fails at inspection or at the utility, so we check them first. The engineering is the same whether the answer is 400A or 800A.
Some owners find out the hard way, with a stalled permit or a charger that can't run. Others see the signs earlier, and each of them points to the same question about capacity.
Any one of these is a reason to ask for a load calculation. Our guide to 100-amp panels and property value goes deeper on the older panels that cause most of these problems.

The cheapest time to size a service for future loads is when the trench is open and the permit is already in process. Adding capacity later means another permit, another utility review and another round of inspections.
List what you are likely to add over the next several years: EV chargers, a heat pump, an induction range, a battery or an ADU. Owners who plan for these loads at the start often find that the next size up costs far less than a second upgrade. Owners who don't plan for them sometimes pay for the same work twice.
Our post on EV charger installation walks through why the service assessment comes before the charger order, and why the utility's transformer capacity can decide the schedule.
An electrical service upgrade needs a permit, and the city and the utility both review the new capacity. We file the permit submissions in-house and start utility coordination on day one of the project. You can see how a permitted upgrade compares with an unpermitted one in the real cost of a permit-pulled panel upgrade.
The city side runs through LADBS, and the power side through LADWP in its service area. One contract covers the design, engineering, permits, construction and city sign-off, so you deal with a single team the whole way.
Ask for the load calculation before you accept a number. A contractor who quotes 800A without one is guessing, and so is one who quotes 400A. The calculation costs far less than a service you have to replace again.
Our complimentary consultation starts with your building's loads and your plans, and you get a fixed price with no subject-to-change clauses. Sam and Shahab are available to every client directly. Call us at (818) 855-1181 or use our contact page, and learn more about our electrical panel upgrades.