How SKS Construction Builds an ADU Faster Than Anyone Else

SKS BLOG

Accessory Dwelling Units (ADUs) have become one of the smartest investments for California homeowners—whether for rental income, multigenerational living, or increasing property value. But while demand for ADUs continues to rise, many homeowners face the same frustration: projects that drag on for months, unexpected delays, and ballooning costs.

At SKS Construction, we’ve redefined the ADU construction process. Our systems, experience, and integrated approach allow us to build high-quality, fully compliant ADUs faster than anyone else—without cutting corners.

Here’s how we do it.

A Design-Build Model That Eliminates Delays

One of the biggest reasons ADU projects take too long is fragmentation. Many homeowners hire:

  • One company for design
  • Another for engineering
  • A separate contractor for construction

This disconnected process leads to miscommunication, redesigns, and costly delays.

SKS Construction operates under a true design-build model, meaning:

  • Architecture, engineering, permitting, and construction are all handled in-house
  • Everyone works from the same plan, timeline, and goal
  • Issues are resolved immediately, not weeks later

Because our teams collaborate from day one, we avoid the back-and-forth that slows most ADU builds.

Deep Expertise in ADU Codes and Local Regulations

ADU regulations in California—and especially in Los Angeles—are complex and constantly evolving. Zoning rules, setbacks, height limits, fire access, SB 721 compliance, and utility requirements can easily stall a project if handled incorrectly.

Speed comes from expertise.

SKS Construction:

  • Specializes in ADU construction, not general remodeling
  • Stays current with state and local ADU laws
  • Designs ADUs that meet code the first time—avoiding plan rejections

Because we know what city reviewers are looking for, permits move faster and revisions are minimized.

Pre-Engineered Systems That Save Weeks on Construction

We don’t reinvent the wheel on every ADU.

Over years of building ADUs, SKS Construction has developed proven construction systems, including:

  • Optimized foundation and framing layouts
  • Standardized structural details approved by engineers
  • Efficient MEP (mechanical, electrical, plumbing) routing

These systems:

  • Reduce engineering revisions
  • Speed up inspections
  • Allow crews to work more efficiently on-site

The result is a smoother build with fewer stoppages and faster completion.

Dedicated, In-House Crews (No Waiting on Subcontractors)

Many ADU projects slow down because contractors rely heavily on third-party subcontractors who juggle multiple jobs at once. When a subcontractor is late, the entire schedule suffers.

SKS Construction uses dedicated, trusted crews who:

  • Work exclusively on our projects
  • Follow our schedules and quality standards
  • Are experienced specifically in ADU construction

This means no waiting weeks for a crew to become “available” and no guessing when the next phase will start.

Smart Scheduling and Parallel Workflows

Most contractors work linearly—finishing one step completely before planning the next.

We don’t.

SKS Construction uses parallel scheduling, meaning:

  • Materials are ordered early to avoid supply delays
  • Inspections are scheduled in advance
  • Next-phase prep begins while current work is underway

By overlapping tasks strategically, we compress the overall timeline without sacrificing quality or safety.

Fewer Change Orders = Faster Completion

Nothing slows an ADU project more than constant changes.

Because we:

  • Spend more time upfront in planning and design
  • Clearly define scope, finishes, and expectations
  • Educate homeowners before construction begins

We dramatically reduce mid-project changes that cause delays, rework, and additional permitting.

A clear plan from the start equals a faster finish.

Proven Track Record of Fast, High-Quality ADU Builds

Speed means nothing without quality—and at SKS Construction, the two go hand in hand.

Our ADUs are built to:

  • Meet or exceed California building codes
  • Pass inspections smoothly
  • Deliver long-term durability and value

Homeowners choose SKS Construction not just because we build fast—but because we build right.

Why Faster ADU Construction Matters

Building an ADU quickly isn’t just about convenience. It means:

  • Faster rental income
  • Lower carrying costs
  • Less disruption to your property
  • Predictable timelines and budgets

In a competitive housing market, speed gives homeowners a real financial advantage.

Build Your ADU Faster—with Confidence

If you’re planning an ADU and want a construction partner who understands speed, compliance, and quality, SKS Construction is ready to help.

We’ve streamlined every step of the ADU process so you can start benefiting from your investment sooner—without stress or surprises.

Contact SKS Construction today to schedule a consultation and discover how quickly your ADU can become a reality.

Get An Estimate Today!

We build trust by producing quality and excellence through our commitment and professionalism. We build trust by our commitment to safety. After all, we’re dedicated to protecting lives and property.

Contact Us

Services Contact
Allow SKS Construction to send you messages through SMS?
admin@sksconstruction.comLic.#: AB720390(818) 855-1181
Serving The Greater Los Angeles Area
Copyright © SKS Construction
Privacy Policy
Proudly designed with TAG Media Space,
Contact Us
envelopephone