How SKS Construction Builds an ADU Faster Than Anyone Else

By Sam J. Shaolian · January 14, 2026
Crew installing windows on a nearly finished backyard ADU

Accessory Dwelling Units (ADUs) have become one of the smartest investments for California homeowners—whether for rental income, multigenerational living, or increasing property value. But while demand for ADUs continues to rise, many homeowners face the same frustration: projects that drag on for months, unexpected delays, and ballooning costs.

At SKS Construction, we’ve redefined the ADU construction process. Our systems, experience, and integrated approach allow us to build high-quality, fully compliant ADUs faster than anyone else—without cutting corners.

Here’s how we do it.

A Design-Build Model That Eliminates Delays

One of the biggest reasons ADU projects take too long is fragmentation. Many homeowners hire:

This disconnected process leads to miscommunication, redesigns, and costly delays.

SKS Construction operates under a true design-build model, meaning:

Because our teams collaborate from day one, we avoid the back-and-forth that slows most ADU builds.

Deep Expertise in ADU Codes and Local Regulations

ADU regulations in California—and especially in Los Angeles—are complex and constantly evolving. Zoning rules, setbacks, height limits, fire access, SB 721 compliance, and utility requirements can easily stall a project if handled incorrectly.

Speed comes from expertise.

SKS Construction:

Because we know what city reviewers are looking for, permits move faster and revisions are minimized.

Pre-Engineered Systems That Save Weeks on Construction

We don’t reinvent the wheel on every ADU.

Over years of building ADUs, SKS Construction has developed proven construction systems, including:

These systems:

The result is a smoother build with fewer stoppages and faster completion.

Dedicated, In-House Crews (No Waiting on Subcontractors)

Many ADU projects slow down because contractors rely heavily on third-party subcontractors who juggle multiple jobs at once. When a subcontractor is late, the entire schedule suffers.

SKS Construction uses dedicated, trusted crews who:

This means no waiting weeks for a crew to become “available” and no guessing when the next phase will start.

Smart Scheduling and Parallel Workflows

Most contractors work linearly—finishing one step completely before planning the next.

We don’t.

SKS Construction uses parallel scheduling, meaning:

By overlapping tasks strategically, we compress the overall timeline without sacrificing quality or safety.

Fewer Change Orders = Faster Completion

Nothing slows an ADU project more than constant changes.

Because we:

We dramatically reduce mid-project changes that cause delays, rework, and additional permitting.

A clear plan from the start equals a faster finish.

Proven Track Record of Fast, High-Quality ADU Builds

Speed means nothing without quality—and at SKS Construction, the two go hand in hand.

Our ADUs are built to:

Homeowners choose SKS Construction not just because we build fast—but because we build right.

Why Faster ADU Construction Matters

Building an ADU quickly isn’t just about convenience. It means:

In a competitive housing market, speed gives homeowners a real financial advantage.

Build Your ADU Faster—with Confidence

If you’re planning an ADU and want a construction partner who understands speed, compliance, and quality, SKS Construction is ready to help.

We’ve streamlined every step of the ADU process so you can start benefiting from your investment sooner—without stress or surprises.

Contact SKS Construction today to schedule a consultation and discover how quickly your ADU can become a reality.

Sam J. Shaolian (CM) leads estimating, engineering and construction operations at SKS Construction. He holds a bachelor’s degree in Civil Engineering with a specialty in Structural Engineering from the University of California, Irvine. His work includes residential, commercial and governmental projects.

Talk to SKS Construction

Have a question about your property or project? Contact our team.

Get An Estimate Today!

We build trust by producing quality and excellence through our commitment and professionalism. We build trust by our commitment to safety. After all, we’re dedicated to protecting lives and property.
Contact Us
Services Contact
Allow SKS Construction to send you messages through SMS?
SKS Construction company logoinfo@sksconstruction.comCA CSLB License #AB720390(818) 855-1181
6445 Sepulveda Blvd Suite #200, Van Nuys, CA 91411
Serving The Greater Los Angeles Area
Copyright © SKS Construction
Privacy Policy
Proudly designed with TAG Media Space,
Contact Us
envelopephone